NOVO Infra NOVO Infra
Projects

Global Project Portfolio

25+ years of successful projects in hydropower, wind, solar and storage across four continents.

0+

Years of Experience

0+

Countries with Projects

0+

Projects Delivered

0

Continents

Wawa Pumped Storage Upper Dam aerial view, Philippines
600 MW · Pumped Storage Philippines · 2023–2025

Wawa Pumped Storage

Meralco Power Generation

Technical direction of one of Asia's largest pumped storage plants combined with the technical supervision of the 84m-high Upper Wawa Dam Pumping station electromechanical equipment with 518+259 MLD pumping capacity and transition to O&M phase.

✔ Specification complete · Smooth operations transition
Mangima HPP penstock installation, Philippines
10+ Plants · PSP Philippines · 2021–2023

Sta. Clara Portfolio

Santa Clara Power Corp

Corporate Director of Renewable Energies coordinating engineering and operational optimisation across 10+ run-of-river HPPs and two 200 MW PSP developments. Key assets: Mangima (12 MW), Tumauini (11.8 MW), Mat-i (5 MW).

✔ Significant CAPEX reduction without quality compromise
Mpanga HPP, Uganda
18 MW · Hydropower Uganda · 2019–2021

Mpanga HPP

responsAbility / rAREH — Kamwenge, Uganda

Run-of-river project: 9 m high RCC dam, 1,800 m open channel, 290 m penstock, surface powerhouse with 3×6 MW Francis turbine-generator units, 6/33 kV outdoor substation. Unit 3 repair plan executed 17 Dec 2019 – 17 Jan 2020, restoring service after 20 months of breakdown and several failed repair attempts by the previous owner. Hydraulic optimisation achieved +3.5% generation increase.

Unit 3 back online in 30 days · Advanced SCADA deployed
Nyamwamba HPP powerhouse, Uganda
Hydropower · Uganda Uganda

Nyamwamba HPP

Uganda — Kasese District

Run-of-river hydropower plant on the Nyamwamba River. Technical direction and O&M management including site inspection, electromechanical supervision, operations training for local engineers and plant performance optimisation.

✔ Plant operations stabilised · Local staff trained to international standards
Masiway HPP outdoor substation, Philippines
132 MW · Hydropower Philippines · 2015–2016

Pantabangan & Masiway HPP

First Gen Hydro Power Corp — Pantabangan, Philippines

Pantabangan: 100 m high earthfill dam, 2×60 MW Francis turbine-generators, 13.8/230 kV substation. Masiway: 25 m high RCC dam, 1×12 MW Kaplan turbine-generator, 13.8/69 kV substation — electromechanical rehabilitation including governor, excitation, protection systems and main transformer under FIDIC contract.

Masiway rehabilitation delivered ahead of schedule under FIDIC
Mount Coffee HPP aerial view, Liberia
88 MW · Hydropower Liberia · 2017

Mount Coffee HPP

Liberia Electricity Corporation (LEC) — Mount Serrado County

25 m high earthfill dam, 4×22 MW Francis turbine-generators, 11/66 kV outdoor substation. Country's main hydropower plant. Role: deputy plant manager and asset management. Led structured hands-on training programme for 5 local operations engineers to international standards.

Local technical capacity built to international standards
Caldas de Reis HPP dam, Spain
10 MW · Mini-Hydro Spain · 1998–2000

Cortizo Mini-Hydro Portfolio

Cortizo Hidroeléctricas, S.A.

Technical direction of design, licensing and operations for 6 mini-hydro plants: Segade (9 MW), Liñares (4 MW), Castro (4.2 MW), Santabaia (1.4 MW), Caldas (1 MW) and Taboada (1.4 MW).

✔ Six plants designed, licensed and commissioned
Masgalán wind farm, Silleda Spain
200+ MW · Wind Spain · 2000–2003

Gamesa Wind Farms Portfolio

Gamesa Energía Renovables

Construction management and O&M of pioneer Spanish wind farms using 660 kW turbines. Key assets: Masgalán (50 MW — 75 turbines in 6 months), Ameixeiras (50 MW), Monte Carrio (31.4 MW), Pedregal (30.6 MW), Monte Treito (30.6 MW).

✔ Farms connected at optimal availability levels
Solar + BESS Philippines · Africa · 2019–2023

Solar PV & Battery Portfolio

Multiple Clients

Operational optimisation across Baras (75 MWac), Bongabon (18.75 MWac) and Rope (50 MWac) in Philippines, Nkhotakota (26 MWp, Malawi) and Makindu (30 MWp, Kenya). BESS integration planning for SPNEC (3,500 MW solar + 4,500 MWh BESS).

✔ Performance ratio optimised across all assets
12 MW · Hydropower Philippines · 2021–2023

Mangima HPP

Mangima Hydro Power Corporation — Bukidnon, Philippines

Run-of-river project: 6 m high RCC dam, 6,404 m of 2 m dia. headrace pipeline, 624 m of 2 m dia. penstock, surface powerhouse with 2×6 MW Zeco Francis turbine-generators, LV/MV, I&C and SCADA, 6/132 kV outdoor substation. Redefinition of electromechanical equipment to optimize CAPEX and increase annual generation by 3%.

CAPEX savings achieved · Annual generation increased +3%
4.86 MW · Hydropower Philippines · 2021–2023

Mat-i HPP

Philnew Hydro Power Corporation — Claveria, Misamis Oriental

Run-of-river project: 9.5 m drop intake, 2,130 m of 2.1 m dia. headrace pipeline, 196 m of 1.5 m dia. penstock, surface powerhouse with 2×2.43 MW Francis turbine-generators, LV/MV, I&C and SCADA, 6/69 kV outdoor substation. Complete redesign of weir, waterways, substation, transmission lines, EM equipment and interconnection point.

CAPEX reduced by 45% · Loan approved by lenders (previously rejected)
224 MW · Hydropower Angola · 2013

Jamba-Ia-Mina HPP

Sogreah FZCO — Jamba-Ia-Mina, Angola

Run-of-river project: 38.5 m high RCC dam (612 m length), 2×5.6×10.55 m intake gates, 223 m penstock (6×4.2 m dia.), surface powerhouse with 3×74.6 MW Francis turbine-generators, indoor switchboards 15 kV, LV/MV, I&C and SCADA. Outdoor substation: 15/220 kV (generation) and 220/30 kV (distribution), 75×64 m.

Technical advisory and engineering services for 224 MW run-of-river plant
Water Infrastructure Saudi Arabia · 2013

Auyayna Pump Station

Sogreah FZCO — Riyadh, Saudi Arabia

Pump station design: 6 Kubota pumps, 10 MW power transformer, MCC, soft starters, MDB, communications systems, substation building, water tank, pump station building, flow meter chamber, guard house, flow headers and surge vessel. Full engineering and project management for government water infrastructure.

Full pump station engineering delivered for Saudi government infrastructure
14 MW · Hydropower Spain · 2003–2006

Salto de Touro HPP

Tasga, Ltd. — Ollares, Touro, Spain

29.75 m high RCC dam, 15×6 m section headrace tunnel, 21 m penstock, surface powerhouse with 2×7 MW Alstom Kaplan turbine-generators, LV/MV, I&C and SCADA. 6/66 kV outdoor substation (12×20 m), 7.7 km overhead powerline at 66 kV. Full project engineering and delivery.

14 MW commissioned · 66 kV grid connection completed
15 MW · Hydropower Spain · 2003–2006

Lérez HPP

Tasga, Ltd. — Cotobade, Spain

Run-of-river project: 11.8 m high RCC dam, 1,965 m of 3 m dia. headrace tunnel, 116 m of 2.5 m dia. penstock, surface powerhouse with 2×7.5 MW Alstom Francis turbine-generators, LV/MV, I&C and SCADA. 6/66 kV outdoor substation, 0.2 km underground powerline at 66 kV. Full project engineering and delivery.

15 MW commissioned · 66 kV underground connection completed
12 MW · Wind Spain · 2008

Muras Wind Farm

Hépotas, S.L. — Muras, Lugo, Spain

Micro-siting and construction of 4 Acciona 3 MW wind turbines (12 MW total), 2 MV circuits, 2+ km optical fibre, O&M building, 3+ km of 20 kV underground cable trenches. 20/132 kV outdoor substation (18×25 m), 4.1 km overhead powerline at 132 kV.

12 MW wind farm built and grid-connected at 132 kV

Trusted Clients & Partners

Meralco Power Generation
First Gen Hydro Corp.
Prime Infra
Santa Clara Power Corp
responsAbility
Liberia Electricity Corp
Gamesa Energía
Cortizo Hidroeléctricas

Ready to Start your Project?

Our engineering team is available to assess your technical requirements on any continent.